Included Hardware: (23x) 1/4"-20 x 1/2" Button Head Bolt | (23x) 1/4"-20 Serr. Flange Nut | (2x) 55mm long M6 Button Head Bolt | (2x) 1-1/2" Nylon Spacer
Inside the vehicle, mount the upper brackets to the molle panels as shown, again using the 1/4" hardware. If installing with our upper shelf, line the bracket up with the front face of the shelf. Tighten the bolts most of the way to hold it in place but keep in mind the bracket may need to be adjusted later. Repeat on the other side.
Make sure all bolts are tightened to complete the install.
HELP CENTER
Articles & Guides
Explore
Support Hub
Lean Cave
GembaTalk
More Resources
Bugs & Improvements
Suggest an improvement, or report a bug, direct from the app/platform.
API Documentation
Connect GembaDocs with external systems